Project Configuration:
1. Malt milling system – mill, conveyor, and associated controls
2. 1000L 2-Vessel Brewhouse
3. 2000L Fermentation Tank
4. 2000L Hot Water Tank
4. Control cabinet
5. 100L CIP cart
Our Story:
Mad Hopper Brewing, a craft brewery known for its high-quality beer and community-driven philosophy, began as a backyard brewing hobby. Over time, the brewery has evolved into a vibrant operation dedicated to making brewing accessible, fun, and sustainable. Mad Hopper’s commitment to environmental responsibility is reflected in practices such as recycling spent grain to feed local cattle and offering fresh wort kits to homebrewers. The brewery’s playful mascot, “Reggie the Bunny,” symbolizes their philosophy of combining high-quality craftsmanship with a touch of fun.
To fulfill its mission, Mad Hopper Brewing sought to expand its operations while maintaining its sustainability goals and commitment to premium brewing. This led them to evaluate multiple brewing equipment suppliers. After reviewing several manufacturers, Mad Hopper Brewing selected Tiantai Equipment, renowned for its high-quality, sustainable brewing systems tailored for craft breweries. Tiantai’s exceptional customer service and commitment to innovation perfectly aligned with the brewery’s goals.
After Tiantai was selected, Mad Hopper Brewing met with the sales team to discuss specific requirements and customize the equipment for its operations. Tiantai’s sales representatives patiently and meticulously reviewed Mad Hopper’s brewing processes, goals, and vision. Working closely with Mad Hopper Brewing, the sales team developed a tailored solution that met the brewery’s requirements for capacity, brewing flexibility, and sustainability.
Mad Hopper Brewing appreciated Tiantai’s transparency in explaining the equipment specifications and the associated manufacturing and delivery timelines. The two parties also discussed training and ongoing support to ensure the Mad Hopper team was fully prepared to operate the new equipment efficiently.
After the equipment was manufactured and inspected, the next step was installation at Mad Hopper Brewing’s facility. Tiantai’s after-sales staff arrived at the customer’s site in advance to coordinate the installation and provide operator training, ensuring smooth and normal brewery operations.
Mad Hopper Brewing’s partnership with Tiantai equipment did not end with the installation. After the equipment was up and running, Tiantai’s customer support team continued to maintain close contact with the brewery, providing ongoing assistance and ensuring the system was optimized and operating at peak efficiency.




