How is false bottom constructed? The false bottom is installed in the Lauter tun to provide support for the grain bed during the mashing in process and to retain the spent grain after runoff is complete. During the runoff...
Introduction of DP in Lauter tun and the solutions to control it DP is the pressure difference between beneath the false bottom and upper, as measured by a gauge, and what the pressure would be, and showing if the grain b...